Residency

RESIDENCY

(1 /2 / 3  HK,BHK Apartments)

TOTAL FLATS – 588

 

SPECIFICATION

 

SUPER STRUCTURE:                 

RCC framed structure (M-25 grade) conforming to seismic zone II specifications.

 

WALLS:

First class K.B. Bricks will be used.

 

PLASTERING:

Walls will be finished with 12 mm thick plastering (1:6) mix.

 

FLOORING/TILE CLADDING:

All floors shall be done with Vitrified tile flooring, Glazed ceramic tiles shall be provided in the dado of toilets up to 4’-6” height. Kitchen cooking platform/sink shall be fixed with Cudappah.  Glazed tiles will be provided over cooking platform up to 2’ toilets will have Anti-Skid Vitrified floor tiles and kitchen will have flooring with Kota stones.

 

DOORS & WINDOWS:

All the doorframes will be Sal wood of 4” x 2 ½” sections with factory made flush doors. Main door shall be of 3’-6” width  and other doors- all factory made flush doors, will be 3’-0” width except toilets, which will be of 2’-6” width. Aluminum window frames and glaze panels along with aesthetically designed safety grills of Mild Steel will be provided at convenient places numbering   1 / 2 in each room as decided by the Developer.

 

ELECTRICAL:

Concealed wiring of Finolex / Anchor or equivalent make. Power plugs for Fridge, T.V., Phone etc. Individual meter boards, miniature circuit breakers (MCB) for each distribution board and modular switches of ISI standard.

 

CONNECTIVITY:

Telecom – telephone point in master bedroom/living area, intercom facility to all the units. Provision for cable T.V. Connection in master Bedroom / Living room.

 

SANITARY WORKS:

The toilets will have one Indian and other one Western W/C. Each toilet has one Towel rail; soap disc and necessary tap connections and sanitary fittings of ISI standard. One washbasin and face mirror will be provided in Dinning / Toilet(s).

 

PAINTS:

All exterior shall be provided with weather coats and interior shall be furnished with Wall Putty. Doors and Windows shall be furnished with required Enamel Paints.

 

WATER SUPPLY:

Common water supply arrangements (Deep Bore-well) will be provided as per the decision of the Developer. Supply line up to over-head tank/s with required capacity will be provided.

 

LIFTS:

High speed passenger lifts with rescue device will be provided by the Developer.

 

POWER BACK-UP:

D.G. set will be supplied for power back-up by the Developer.

 

SHOPPING MALL:

Well equipped, modern shopping mall will be developed within the complex by the Developer.

 

COMPOUND WALL:

Decorated gated compound having 10” plastered brick wall up to 6’ height from ground level with designer gate/s of required dimension will be provided by the Developer.

 

DESCRIPTION OF LAND / BUILDING :

Dist. – Puri, P.S.: Pipili, No.- 05, Tahasil – Pipili, under the jurisdiction of Sub-Registrar, Pipili, Mouza – Bahilipada, Total Area Ac. 3.170 decs., Kissam: Gharabari.

 

APPROVAL:

Approval of Building Plan obtained from the office of Block Development Officer, Pipili, Vide Letter No. 2818, dtd. 03 / 12 / 2010, over Plot No. 20/757, Khata No.- 65/234, Plot No. – 281/588, Khata
No. – 65/76, Plot No.- 19, Khata No. – 17, Plot
No.- 20/655, Khata No. – 65/81, Plot No.- 18, Khata No. – 56, Plot
No.- 20, Khata No. – 65/4, Plot No.- 19, Khata No. – 17 in Mouza Bahilipada.

 

SCHEDULE OF PAYMENT

(Subject to change by the Builder in case of change of plan)

Reserved Parking: Rs. 1, 50,000/- (Open) / Rs. 2, 50,000/- (Stilt)

 

Installment Stages

Amount

Booking Amount 10% of flat cost
Agreement Amount (Within 30days of Booking ) 15% of total flat cost (Including Booking Amount)
After Foundation Level 20% of total flat cost
After completion of Basement 3.5% of total flat cost
After Roof Slab of First  Floor 3.5% of total flat cost
After Roof Slab of Second Floor 3.5% of total flat cost
After Roof Slab of Third Floor 3.5% of total flat cost
After Roof Slab of Fourth Floor 3.5% of total flat cost
After Roof Slab of Fifth Floor 3.5% of total flat cost
After Roof Slab of Sixth Floor 3.5% of total flat cost
After Roof Slab of Seventh Floor 3.5% of total flat cost
Completion of Brick work of respective flat 10% of total flat cost
After Fitting of Choukath & Plastering 10% of total flat cost
After Final Fitting & Finishing 3.5% of total flat cost
At the time of Handover 3.5% of total / remaining final payment of flat cost

 

 N.B.: Registration Cost, Proportionate Transformer / Electrification Cost, Service Tax (currently applicable @ 3.09% of total consideration amount) & Society Charges Extra.

(Prices are subject to change with/ without prior notice)