RESIDENCY
(1 /2 / 3 HK,BHK Apartments)
TOTAL FLATS – 588
SPECIFICATION
SUPER STRUCTURE:
RCC framed structure (M-25 grade) conforming to seismic zone II specifications.
WALLS:
First class K.B. Bricks will be used.
PLASTERING:
Walls will be finished with 12 mm thick plastering (1:6) mix.
FLOORING/TILE CLADDING:
All floors shall be done with Vitrified tile flooring, Glazed ceramic tiles shall be provided in the dado of toilets up to 4’-6” height. Kitchen cooking platform/sink shall be fixed with Cudappah. Glazed tiles will be provided over cooking platform up to 2’ toilets will have Anti-Skid Vitrified floor tiles and kitchen will have flooring with Kota stones.
DOORS & WINDOWS:
All the doorframes will be Sal wood of 4” x 2 ½” sections with factory made flush doors. Main door shall be of 3’-6” width and other doors- all factory made flush doors, will be 3’-0” width except toilets, which will be of 2’-6” width. Aluminum window frames and glaze panels along with aesthetically designed safety grills of Mild Steel will be provided at convenient places numbering 1 / 2 in each room as decided by the Developer.
ELECTRICAL:
Concealed wiring of Finolex / Anchor or equivalent make. Power plugs for Fridge, T.V., Phone etc. Individual meter boards, miniature circuit breakers (MCB) for each distribution board and modular switches of ISI standard.
CONNECTIVITY:
Telecom – telephone point in master bedroom/living area, intercom facility to all the units. Provision for cable T.V. Connection in master Bedroom / Living room.
SANITARY WORKS:
The toilets will have one Indian and other one Western W/C. Each toilet has one Towel rail; soap disc and necessary tap connections and sanitary fittings of ISI standard. One washbasin and face mirror will be provided in Dinning / Toilet(s).
PAINTS:
All exterior shall be provided with weather coats and interior shall be furnished with Wall Putty. Doors and Windows shall be furnished with required Enamel Paints.
WATER SUPPLY:
Common water supply arrangements (Deep Bore-well) will be provided as per the decision of the Developer. Supply line up to over-head tank/s with required capacity will be provided.
LIFTS:
High speed passenger lifts with rescue device will be provided by the Developer.
POWER BACK-UP:
D.G. set will be supplied for power back-up by the Developer.
SHOPPING MALL:
Well equipped, modern shopping mall will be developed within the complex by the Developer.
COMPOUND WALL:
Decorated gated compound having 10” plastered brick wall up to 6’ height from ground level with designer gate/s of required dimension will be provided by the Developer.
DESCRIPTION OF LAND / BUILDING :
Dist. – Puri, P.S.: Pipili, No.- 05, Tahasil – Pipili, under the jurisdiction of Sub-Registrar, Pipili, Mouza – Bahilipada, Total Area Ac. 3.170 decs., Kissam: Gharabari.
APPROVAL:
Approval of Building Plan obtained from the office of Block Development Officer, Pipili, Vide Letter No. 2818, dtd. 03 / 12 / 2010, over Plot No. 20/757, Khata No.- 65/234, Plot No. – 281/588, Khata
No. – 65/76, Plot No.- 19, Khata No. – 17, Plot
No.- 20/655, Khata No. – 65/81, Plot No.- 18, Khata No. – 56, Plot
No.- 20, Khata No. – 65/4, Plot No.- 19, Khata No. – 17 in Mouza Bahilipada.
SCHEDULE OF PAYMENT
(Subject to change by the Builder in case of change of plan)
Reserved Parking: Rs. 1, 50,000/- (Open) / Rs. 2, 50,000/- (Stilt)
Installment Stages |
Amount |
Booking Amount | 10% of flat cost |
Agreement Amount (Within 30days of Booking ) | 15% of total flat cost (Including Booking Amount) |
After Foundation Level | 20% of total flat cost |
After completion of Basement | 3.5% of total flat cost |
After Roof Slab of First Floor | 3.5% of total flat cost |
After Roof Slab of Second Floor | 3.5% of total flat cost |
After Roof Slab of Third Floor | 3.5% of total flat cost |
After Roof Slab of Fourth Floor | 3.5% of total flat cost |
After Roof Slab of Fifth Floor | 3.5% of total flat cost |
After Roof Slab of Sixth Floor | 3.5% of total flat cost |
After Roof Slab of Seventh Floor | 3.5% of total flat cost |
Completion of Brick work of respective flat | 10% of total flat cost |
After Fitting of Choukath & Plastering | 10% of total flat cost |
After Final Fitting & Finishing | 3.5% of total flat cost |
At the time of Handover | 3.5% of total / remaining final payment of flat cost |
N.B.: Registration Cost, Proportionate Transformer / Electrification Cost, Service Tax (currently applicable @ 3.09% of total consideration amount) & Society Charges Extra.
(Prices are subject to change with/ without prior notice)